History
  • 2024
    • 01 Signed MOU with UFort Knox in Bermuda
    • 01 Signed MOU with TUG Group in Nigeria
    • 01 Signed MOU with SEALEXCO in USA
  • 2023
    • 12 Selected as a specialized energy company - Ministry of Trade, Industry and Energy
    • 11 Submitted a proposal for the 120MW floating photovoltaic in Sabah
    • 11 Submitted a proposal for the 540MW floating marine photovoltaic in Swansea City, UK
    • 11 Submitted a proposal for the 334MW floating photovoltaic in Sarawak
    • 11 Signed MOU with UK SOLAR POWER, UK
    • 11 Signed MOU with Suncore Innovations, Australia
    • 11 Signed MOU with Ali Asswociates, Bangladesh
    • 10 Submitted a bidding proposal for 13.2MW TMU DAM floating photovoltaic in Morocco
    • 08 Completed the construction of the 1MW Goshi reservoir floating photovoltaic
    • 07 Registered as an overseas construction company
    • 07 Visited by the Minister of Industry of Sabah, Malaysia
    • 03 Morocco rooftop photovoltaic 20MW EPC MOA
    • 02 Completed the construction of the 1MW Bongam reservoir floating photovoltaic
    • 01 Completed the construction of the 1MW Jisan reservoir floating photovoltaic
  • 2022
    • 11ISO 45001 Certification
    • 09 Awarded for connecting cultural tourism and water quality improvement
    • 09 09 Selected as the lead institution for photovoltaic R&D – Ministry of SMEs and Startups
    • 09Green technology certification - Ministry of SMEs and Startups
    • 09Confirmed for direct production of photovoltaic power generation equipment, prefabricated structures, and marine floating structures – Small & Medium Business Distribution Center
    • 08Selected as a Promising SME - Jeollanam-do
    • 08Selected for a Net-Zero Technology Innovation and Development Project (R&D) for SMEs and provided KRW 3 billion in government funding - Ministry of SMEs and Startups
    • R&D for ¡°floating photovoltaics linked to cultural tourism and water quality improvement¡±
  • 2021
    • 10Selected as one of "National 1000 Innovative Companies" - Ministry of Trade, Industry and Energy, Ministry of SMEs and Startups
    • 12Selected as a startup fostering support company - Korea Water Resources Corporation
    • 07Certification of intellectual property management
    • 06Declared EDPR USD 100 million investment during the state visit of the president Jaein Moon to Spain (Oma reclaimed land)
    • 05Selected as a company designated for military service
    • 05New Excellent Technology Certification (NET) - Ministry of Trade, Industry and Energy
    • 01Selected as an excellent company in Seoul (Hi Seoul company) - Seoul Metropolitan Government
  • 2020
    • 10Established the Oma hedori photovoltaic power plant corporation
    • 10Established the Odo hedori photovoltaic power plant corporation
    • 09Co-developed the 350MW photovoltaic with EDPR, Spain (exclusive contract)
    • 09Registered a factory to produce floating bodies and structures for floating photovoltaics (Gunsan National Industrial Complex)
    • 05Conducted R&D projects to foster local key industries
  • 2019
    • 12Relocated the R&D Center to Seoul
    • 10Participated in Malaysia Environmental Technology and Product Fair
    • 04Judged successful in R&D subject to purchase - Ministry of SMEs and Startups
  • 2018
    • 12Consulted for a water surface lease agreement on the 600kw floating photovoltaic on a reservoir in Itsugawa city, Japan
    • 10 Selected for priority purchase of excellent inventions - Korea Invention Promotion Association
    • 0909ISO9001 Certification
    • 09Patented technology valuation KRW 5.8 billion, KDB Industrial Bank
    • 06Participated in Ilsan Kintex 2018 World Photovoltaic Expo Exhibition
    • 05Selected for a global technology commercialization consulting support project by Korea Technology Venture Foundation
    • 03Established Hedori photovoltaic power plant SPC corporation
    • 03Selected as a Global IP Star Company - Jeonnam Intellectual Property Center
  • 2017
    • 12Signed MOU with Korea Hydro & Nuclear Power for joint development of 100MW floating photovoltaic
    • 12Certified as a venture company – Korea SMEs and Startups Agency
    • 11Letter of intent to participate in the Yongin Idong reservoir floating photovoltaic project of Korea Western Power Co., Ltd.
    • 09Certified for a company-affiliated research center
    • 06Exceeded KRW 60 billion in photovoltaic construction project orders
    • 05Registered as a member of the Renewable Energy Association
    • 05Increased capital by KRW 500 million
  • 2016
    • 08Confirmation of Government R&D project for new product development subject to purchase - Small and Medium Business Administration
    • "R&D on rotating floating photovoltaic power generation technology"
    • 03Changed name from Mecha solar Tech to BK Energy Co., Ltd.
  • 2015
    • 10Confirmation of customized business support - Korea Institute of Startup & Entrepreneurship Development
    • 04 Acquired electrical construction business license - Jeollanam-do Governor
    • 03Registered as a partner company of SK Telecom - SK Telecom
    • 03 Signed MOU for investment agreement – Yeosu, Jeollanam-do
    • 02 Established Mecha sola tech corporation – Register office, Tax office
  • 2014
    • 12Applied for a patent for "Floating photovoltaic power generation equipment"
    • 11 Applied for a patent for "Rotating floating photovoltaic power generation equipment"
  • 2023
    • 10 Registered a patent for ¡ºAI single axis photovoltaic power generation equipment¡»
    • 09 Registered a patent for ¡ºGrounding system of floating photovoltaic power generation facilities¡»
    • 05 Registered a patent for ¡ºNanocoating solution manufacturing equipment¡»
    • 04 Registered a patent for ¡ºHelical anchor pile¡»
    • 02 Registered a patent for ¡ºAnchor for floating photovoltaic power generation equipment and its construction method¡»
  • 2022
    • 12 Registered a patent for ¡ºVertical photovoltaic power generation equipment using light filter¡»
    • 12 Registered a patent for ¡ºStepwise mooring system for floating photovoltaic power generation structures¡»
    • 09 Registered a patent for ¡ºAI agrophotovoltaic power system¡»
    • 07 Registered a patent for ¡ºSofa block¡»
    • 02 Applied for a patent for ¡ºSingle axis vertical bifacial agrophotovoltaic power generation equipment with adjustable sunlight for crops¡»
    • 02 Registered a patent for ¡ºConnection port for floating unit photovoltaic power generation equipment¡»
  • 2021
    • 11 Registered a patent in US for ¡ºFloating photovoltaic power generation equipment¡»
    • 09 Applied for a patent for ¡ºVertical solar power generation equipment using light filter¡»
    • 06 Registered a patent for ¡ºFrame assembly of photovoltaic power generation equipment for soft ground¡»
    • 05 Certified as a New Excellent Technology (NET) ¡ºTechnology to improve power generation efficiency of floating photovoltaics by applying a turntable method¡»Technology Development History
    • 05 Applied for a patent for ¡ºHelical Anchor Pile¡»
    • 04 Applied for a patent for ¡ºAnchor for floating photovoltaic power generation equipment and its construction method¡»
    • 04 Registered a patent for ¡ºNon-penetrating lift-reducing photovoltaic power generation module equipment and the photovoltaic power generation system using the same¡»
    • 04 Applied for a patent for ¡ºStepwise mooring system for floating photovoltaic power generation structures¡»
    • 02 Registered a patent for ¡ºFloating garbage collection equipment¡»
    • 02 Applied for a patent for ¡ºGrounding system of floating photovoltaic power generation facilities¡»
    • 01 Registered a patent for ¡ºFloating body cover unit for preventing attachment of aquatic organisms¡»
    • 01 Applied for a patent for ¡ºAI single axis photovoltaic power generation equipment¡»
  • 2020
    • 1212 Registered a design for ¡ºWings for wind turbines¡»
    • 11 Applied for a patent for ¡ºNanocoating solution manufacturing equipment¡»
    • 11 Applied for a design for ¡ºAI photovoltaic power generation equipment¡»
    • 10 Registered a patent for ¡ºFloating body with improved durability and floating photovoltaic power generation equipment using the same¡»
    • 10 Registered a patent for ¡ºLow noise marine floating wind power generation equipment¡»
    • 10 Registered a patent for ¡ºFrame connection unit and photovoltaic power generation equipment using the same¡»
    • 08 Registered a patent in Japan for ¡ºFloating photovoltaic power generation equipment¡»
    • 07 Registered a design for ¡ºFloating bodies¡»
    • 07 Registered a patent for ¡ºPhotovoltaic panel coating method and photovoltaic power generation equipment using the same¡»
    • 04 Applied a design for ¡ºWings for wind turbines¡»
    • 03 Applied for a patent for ¡ºLow noise marine floating wind power generation equipment¡»
  • 2019
    • 10 Applied for a patent for ¡ºFloating body cover unit for preventing attachment of aquatic organisms¡»
    • 10 Registered a patent for ¡ºPhotovoltaic power generation system with variable angle adjustment equipment¡»
    • 08 Registered a trademark for ¡ºHedori¡»
    • 05 Registered a patent for ¡ºMooring and rotation equipment of floating photovoltaic power generation systems¡»
    • 04 Applied for a patent for ¡ºFloating body with improved durability and the floating photovoltaic power generation system using the same¡»
    • 01 Registered a patent for ¡ºFrame connection unit and photovoltaic power generation equipment using the same¡»
  • 2018
    • 02Applied for a patent for ¡ºSupporting structure and photovoltaic power generation equipment having the same¡»
  • 2017
    • 01Applied for a patent for ¡ºFloating body and structure connection unit of floating photovoltaic power generation equipment¡»
    • 07Applied for a patent for ¡ºSupporting structure and photovoltaic power generation equipment having the same ¡»
    • 02Registered a trademark for ¡ºHedori¡»
  • 2016
    • 11Registered a patent for ¡ºRotating floating photovoltaic power generation equipment¡»
    • 04 Registered a patent for ¡ºFloating photovoltaic power generation equipment¡»
    • 04 Registered a trademark for ¡ºFloating photovoltaic Hedori¡»
  • 2014
    • 12Applied for a patent for ¡ºFloating photovoltaic power generation equipment¡»
    • 11 Applied for a patent for ¡ºRotating floating photovoltaic power generation equipment¡»
  • 2024
    • 02 Completed the construction of the 449.4KW floating photovoltaic in Okcheon district of the Korea Rural Community Corporation
  • 2023
    • 09Completed the construction of the 200KW in Hwadong-ri, Yeosu
    • 08 Completed the construction of the 999KW floating photovoltaic in Goshi district of the Korea Rural Community Corporation
    • 05 Completed the construction of the Hwangi Kim Art Museum (Floating museum) (Electrical facilities) (1st)
    • 02 Completed the construction of the 999KW floating photovoltaic in Bongam district of the Korea Rural Community Corporation
    • 01 Completed the construction of the 922.5KW floating photovoltaic in Jisan district of the Korea Rural Community Corporation
  • 2022
    • 12 Completed the construction of the 102.96KW floating photovoltaic power plant for training at Chonbuk National University
    • 12 Completed the construction of the 35KW of photovoltaic power generation facility at the senior citizen center in Gangjin-gun in the second half of 2022
    • 12 Completed the construction of the 500KW in Eook-ri, Micheon-myeon, Jinju
    • 09 Completed the replacement of distribution boards for Yeosu Shinwol Elementary School and Yeosu Buyoung Elementary School
    • 09 Completed the electricity construction for the dangerous section improvement project on the Woldeung local road in Suncheon
    • 09 Completed the power generation license for 59MW in Goheung, Jeonnam
    • 06 Started the construction of the 300KW in Imok-ri, Yeosu City
    • 06 Conducted the salinity measurement for the 38MW floating photovoltaic in joseong- myeon, Boseong-gun
    • 06 Conducted the resident approval for the 320MW in Goseong, Gyeongnam
    • 03 Started the construction of the 998.75KW in Wolwoon district of the Korea Rural Community Corporation
  • 2021
    • 08Constructed the 700KW Nanocoating of KEPCO Solar
    • 08 Completed the construction of the roof photovoltaic 200KW at the factory of Martek Co., Ltd., KEPCO Solar Gwangyang
    • 05 Completed the construction of new security light (unit price contract) in Yulchon- myeon, Dolsan-eup, 2021
    • 05 Completed the repair work of the Seoyeosu Road lighting short circuit section (unit price contract), 2021
    • 04 Completed the construction of the 100KW in Wol-ri, Seocheon-gun
  • 2020
    • 12Completed the construction of the 700KW in Wonsu-ri Seocheon-gun
    • 12 Completed the construction of the 800KW in Juhang-ri, Seocheon-gun
    • 11 Prepared for the construction plan report for the 1,200KW in Imok-ri, Yeosu-si
    • 10 Applied for the 780KW power generation license for Gobong-ri, Gunsan-si
    • 10 Completed the second repair work of road lighting facilities (unit price contract), 2020
    • 08 Completed the construction of the rooftop photovoltaic at Seoul National University of Science and Technology
    • 08 Completed the construction of the 925KW in Hwadong-ri, Yeosu-si
    • 07 Completed the construction of the 350KW in Jukpo-ri, Yeosu-si
    • 04 Completed the construction of the 950KW in Najin-ri, Yeosu-si
    • 01 Completed the construction of the 1,200KW in Gusang-ri, Suncheon-si
  • 2019
    • 06Completed the construction of the 2,000KW in Bongdang-ri, Gwangyang-si
    • 06 Completed the construction of the 350KW in Sanhu-ri, Taean-gun
    • 01 Completed the construction of the 1,300KW in Boksan-ri, Yeosu-si
  • 2018
    • 12Consulted for a water surface lease agreement on the 600KW floating photovoltaic on a reservoir in Itsugawa city, Japan
    • 11 Applied for the power generation license and development activity license for the 900KW in Anpo-ri, Yeosu City
    • 11 Completed the 20MW power generation license on Hakpa reservoir
    • 11 Obtained licenses for stream clearance of shared water surface and power generation of floating photovoltaic in Anpo-ri, Yeosu-si
    • 10 Completed the construction of the 300KW in Geumbong-ri, Yeosu-si
    • 08 Completed the 100KW power generation license in Jukseok-ri, Naju-si
    • 07 Applied for the 20MW floating photovoltaic power generation license on Hakpa reservoir
    • 05 Completed the 500KW development license in Yangmae-ri, Muan-gun
    • 01 Completed the construction of Hedori 1 (300KW), rotating floating photovoltaic on Maehyang reservoir
  • 2017
    • 12 Signed MOU for joint development of the 100MW floating photovoltaic with Korea Hydro & Nuclear Power Co., Ltd.
    • 12 Applied for the use beyond purpose of Busaho reservoir, 50MW -Boryeong city hall
    • 11 Started the construction of the 2,000KW photovoltaic power plant in Janggye-ri, Doyang-eup, Goheung-gun - Goheung-gun office
    • 11 Completed the construction of the 1,300KW photovoltaic power plant in Boksan-ri, Sora-myeon, Yeosu-si - Yeosu city hall
    • 10 Completed the construction of the 200KW floating photovoltaic power plant on Maehyang reservoir, Boryeong-gun
    • 05 Completed the 2,000KW power generation license for Bonggye-dong, Yeosu-si (application of development acts completed)
    • 05 Started the construction of the rotating floating photovoltaic power plant on Maehyang reservoir, Boryeong-gun
    • 04 Completed the 750KW power generation license in Dohwa-myeon, Goheung-gun
    • 03 Completed the construction of the 2,000KW photovoltaic in Bongdang-ri, Bonggang- myeon, Gwangyang-si
    • 01 Obtained the approval of the floating photovoltaic power generation license on Maehyang reservoir in Boryeong - Boryeong city hall
    • 01 Completed the 3,500KW power generation license in Okgang-ri, Goheung-gun (small scale environmental assessment completed / supplement in progress for disaster stability assessment)
    • 01 Completed the construction of the 1,600KW power generation license for Valpo-ri, Goheung-gun
  • 2016
    • 12Completed the 5,000KW power generation license for Janggye-ri, Goheung-gun (connection work in progress)
  • 2015
    • 11Completed the electrical construction for Army 31st Division Sangmudae
    • 04 Completed the construction of the rooftop photovoltaic of Hajung Refrigeration – SK Telecom