We make the world brighter with new and renewable energy that is harmonious with nature

Business Performance

With technologies that make the earth a better place by the power of nature B.K. Energy is a leading company in the floating solar power business
2022
  • 09Commenced electrical construction for the Suncheon Woldeung provincial road improvement project
  • 09Acquired permission for 59MW power generation in Goheung City, Jeollanam-do
  • 07Commenced the distribution panel replacement work for Yeosu Sinwol Elementary School and Yeosu Buyeong Elementary School
  • 06Commenced the construction (300KW) in Imok-ri, Yeosu, Korea
  • 06Commenced the construction (200KW) in Hwadong-ri, Yeosu, Korea
  • 06Conducted salinity measurement on the floating solar power facility (38MW) in Joseong-myeon, Boseong-gun, Jeollanam-do, Korea
  • 06Conducted the resident's agreement procedure for the 320MW power facility in Goseong, Gyeongsangnam-do, Korea
  • 04Commenced the construction of a water-floating solar photovoltaic power generator of 998.75KW capacity in Gosi as commissioned by Korea Rural Community Corporation
  • 03Commenced the construction of a water-floating solar photovoltaic power generator of 998.75KW capacity in Bonham as commissioned by Korea Rural Community Corporation
  • 03Commenced construction of a water-floating solar photovoltaic power plant of 998.75KW capacity in Wolwoon as commissioned by Korea Rural Community Corporation
2021
  • 12Commenced the construction of a water-floating solar photovoltaic power plant of 918.72KW capacity in Jisan as commissioned by Korea Rural Community Corporation
  • 08Commenced a nano-coating construction (700KW) for KEPCO Solar
  • 08Completed the roof solar power (200KW) construction for Matech factory of KEPCO Solar
  • 05Completed the 2021 Security Lights Construction project (unit price contract) in Yulchon-myeon, Dolsan-eup, Yeosu, Jeollanam-do, Korea
  • 05Completed the 2021 Short Circuit Repair for Road Lights West Yeosu project
  • 04Completed the construction (100KW) in Wolli, Seocheon-gun, Chungcheongnam-do, Korea
2020
  • 12Commenced the completion phase of the construction (700KW) in Wonsu-ri, Seocheon-gun, Chungcheongnam-do, Korea
  • 12Commenced the completion phase of the construction (800KW) in Juhang-ri, Seocheon-gun, Chungcheongnam-do, Korea
  • 11Completed the preparation of a 1,200KW construction plan report in Imok-ri, Yeosu, Jeollanam-do, Korea
  • 10Applied for 780KW power generation license in Gobong, Gunsan, Jeollabuk-do, Korea
  • 10Completed (2nd completion) the 2020 Road Lights Repair project (unit price contract)
  • 08A rooftop solar photovoltaic power plant completed at Seoul National University of Science and Technology
  • 08Completed construction (925KW) in Hwadong-ri, Yeosu, Jeollanam-do, Korea
  • 07Completed construction (350KW) in Jukpo-ri, Yeosu, Jeollanam-do, Korea
  • 04Completed construction (925KW) in Najin-ri, Yeosu, Jeollanam-do, Korea
  • 01Completed construction (1,200KW) in Gusang-ri, Suncheon, Jeollanam-do, Korea
2019
  • 06Completed construction (2,000KW) in Bongdang-ri, Gwangyang, Jeollanam-do, Korea
  • 06Completed construction (350KW) in Sanhu-ri, Taean-gun, Chungcheongnam-do, Korea
  • 01Completed construction (1,300KW) in Boksan-ri, Yeosu, Jeollanam-do, Korea
2018
  • 12Closed a water surface lease contract with Itsugawa City Office, Japan, for a water floating-type solar photovoltaic power generation (600KW) on a local reservoir
  • 11Applied for permission for a 900KW power generation and development project in Anpo-ri, Yeosu, Jeollanam-do, Korea
  • 11Acquired the power generation license (20MW) for the Hakpa Reservoir plant
  • 11Acquired permit for occupation and use of public water surface and the license for the water floating-type solar photovoltaic power generation in Anpo-ri, Yeosu, Jeollanam-do, Korea
  • 10Completed construction (300KW) in Geumbong-ri, Yeosu, Jeollanam-do, Korea
  • 08Acquired permit for the power generation (100KW) project in Jukseok-ri, Naju, Jeollanam-do, Korea
  • 07Applied for permission for the 20MW water floating-type solar photovoltaic power generation at Hakpa Reservoir
  • 05Acquired the development permission for 500KW power generation in Yangmae-ri, Muan-gun, Jeollanam-do, Korea
  • 01Completed the Haedori No. 1 (300KW) construction - rotary water floating-type solar photovoltaic power plant
2017
  • 12Closed an MOU with Korea Hydro & Nuclear Power Co., Ltd. for a joint floating solar power project (100MW)
  • 12Applied for the permission of non-purpose use (50MW) of Busaho Reservoir - Boryeong City Office
  • 11Commenced the construction of a solar photovoltaic power plant (2,000KW) in Janggye-ri, Doyang-eup, Goheung-gun, Jeollanam-do, Korea - Goheung-gun Office
  • 11Completed the construction of a solar photovoltaic power plant (1,300KW) in Boksan-ri, Sora-myeon, Yeosu, Jeollanam-do, Korea -Yeosu City Office
  • 10Completed the construction of a water floating-type solar photovoltaic power plant (200KW) in Maehyang Reservoir in Boryeong, Chungcheongnam-do, Korea
  • 05Acquired permit for the power generation (2,000KW) project in Bongye-dong, Yeosu, Jeollanam-do, Korea (with the application for development)
  • 05Commenced the construction of Boryeong Maehyang Reservoir Rotary Water Floating-type Solar Photovoltaic Power Plant
  • 04Acquired permit for the power generation (750KW) project in Dohwa-myeon, Goheung-gun, Jeollanam-do, Korea
  • 03Completed the construction of a solar photovoltaic power plant (2,000KW) in Bongdang-ri, Bonggang-myeon, Gwangyang, Jeollanam-do, Korea
  • 01Acquired license for the water floating-type solar photovoltaic power generation business in Maehyang Reservoir in Boryeong, Chungcheongnam-do, Korea - Boryeong City Office
  • 01Acquired permit for the power generation (3,500KW) project in Okgang-ri, Goheung-gun, Jeollanam-do, Korea (with the small-scale environmental assessment completed and the disaster stability in a complementary phase)
  • 01Acquired permit for the power generation (1,600KW) project in Balpo-ri, Goheung-gun, Jollanam-do, Korea
2016
  • 12Acquired permit for the power generation (5,000KW) project in Janggye-ri, Goheung-gun, Jollanam-do (with the lane connection in progress)
2015
  • 11Completed electric construction in Army 31st Division Sangmudae
  • 04Completed the Rooftop Solar Photovoltaic Power Plant Construction project for Hajeong Refrigeration as commissioned by S.K. Telecom